COSTS AND SCHEDULE

What does a bathroom renovation cost?

The cost of a bathroom renovation depends on the room, the changes you want, materials, fixtures and finishing. A useful estimate therefore starts not with a standard price, but with your bathroom and your plans.

Bathroom where material choices and finishing form a coherent whole
JODO BAD

Costs and schedule

01No standard priceStarting point
0210–14 working daysComplete renovation
03Photos and wishesInitial assessment

AN HONEST VIEW OF THE SCOPE

Why one standard price says very little.

No two bathrooms are the same. A standard price without seeing the room can therefore create more confusion than clarity.

Jodo Bad starts with the existing bathroom, the changes you want and the level of finish. This allows us to discuss the scope honestly and specifically.

01

The existing situation

The existing construction and layout determine how much needs to change. Renovating within the current layout is different from rebuilding the bathroom from the ground up.

02

Your choices and finish

Fixtures, materials and finishing affect the scope of the project. We therefore consider these choices together, not as isolated lines on a list.

03

Plumbing and preparation

Preparation and plumbing work also matter. Photos and a clear explanation help us take them into account from the outset.

HOW WE WORK

From a general question to a considered estimate.

The clearer the existing situation and your wishes are, the more focused the conversation about scope and scheduling can be.

  1. 01

    Show the room clearly

    Take photos that show the whole bathroom as well as important details.

  2. 02

    Describe your plans

    Explain what should stay, what can go and what you would like to achieve.

  3. 03

    Get focused clarity

    We discuss which choices and work determine the scope.

  4. 04

    Make the plan concrete

    Once the choices are clear, the work can be scheduled in an organised way.

FREQUENTLY ASKED QUESTIONS

Clarity before you get in touch.

Can’t find your question? Feel free to send us a few photos of the situation via WhatsApp.

01Why is there no fixed price?

Costs vary according to the room, existing situation, layout, materials, fixtures and desired finish. Without that context, a single figure says very little.

02What can I send for an initial assessment?

Send clear overview and detail photos of your current bathroom and briefly describe what you would like to keep or change.

03Do material choices affect the cost?

Yes. Materials, bathroom fixtures and the desired level of finish all help determine the overall scope of the project.

04How long does a complete renovation take?

We allow 10–14 working days for a complete bathroom renovation once the scope and choices are clear.

ASK THE JODO TEAM

A useful estimate starts with your bathroom.

Send photos of your current bathroom and explain what you would like to keep or change. This creates an honest starting point for the conversation.